Get Latest Jun-2025 Conduct effective penetration tests using Actual4Labs C_TS4CO_2023 [Q23-Q47]

Share

Get Latest [Jun-2025] Conduct effective penetration tests using Actual4Labs C_TS4CO_2023

Penetration testers simulate C_TS4CO_2023 exam PDF

NEW QUESTION # 23
You are creating new activity type and want to maintain plan prices for a cost center. Which attribute must you configure in the activity type master record? Note: There are 3 correct answers to this question.

  • A. Activity type category
  • B. Price indicator
  • C. CO version
  • D. Valid cost center categories
  • E. Company code

Answer: A,B,D


NEW QUESTION # 24
Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question.

  • A. Cost center/activity type price calculation
  • B. Execution of the assessment cycles
  • C. Settlement of internal orders
  • D. Business process price calculation

Answer: A,D


NEW QUESTION # 25
Which type(s) of Profitability Analysis update (s) the cost of goods sold at the time of delivery only?

  • A. Combined profitability analysis
  • B. Both margin analysis and costing-based
  • C. Costing-based
  • D. Margin analysis

Answer: D


NEW QUESTION # 26
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control?
Note: There are 2 correct answers to this question.

  • A. The availability of funds according to tolerance limits
  • B. The availability of funds in object currency
  • C. The availability of funds using overall plan value
  • D. The availability of funds on a period level

Answer: A,C

Explanation:
Detailed Explanation: Budget availability control in SAP S/4HANA allows checking funds based on overall plan value (option C) and tolerance limits (option D). These checks ensure effective budget management across projects and internal orders.


NEW QUESTION # 27
Which type(s) of Profitability Analysis update(s) the cost of goods sold at the time of delivery only?

  • A. Combined profitability analysis
  • B. Both margin analysis and costing-based
  • C. Costing-based
  • D. Margin analysis

Answer: D

Explanation:
Detailed Explanation:Margin analysis in SAP S/4HANA updates the cost of goods sold (COGS) atdelivery, aligning profitability reporting more closely with revenue recognition. This enables timely and accurate COGS updates tied to actual deliveries.


NEW QUESTION # 28
Which parameters are controlled by the costing type in a costing variant?
Note: There are 2 correct answers to this question.

  • A. Price updates
  • B. Save with date key
  • C. Costing sheet
  • D. Price for materials

Answer: A,B

Explanation:
Detailed Explanation:In SAP S/4HANA, the costing type in a costing variant specifies parameters like date key for saving costs and price updates, allowing businesses to manage cost calculations over different periods and adjust for price changes.


NEW QUESTION # 29
Which of the following API types does SAP recommend to use to achieve clean core Integrations?
Note: There are 2 correct answers to this question.

  • A. OData
  • B. SOAP
  • C. RFC
  • D. IDoc

Answer: A,B

Explanation:
Detailed Explanation:SAP S/4HANA Cloud Private Edition encourages clean core integrations using modern API frameworks such as SOAP and OData. These APIs provide robust and standardized connectivity options that support extensibility and integration, without modifying the core SAP codebase. OData, in particular, aligns with SAP Fiori for easier integration across platforms, while SOAP offers strong support for more complex integrations and high-volume transactions.


NEW QUESTION # 30
Which field can you select for both reporting in costing-based and account-based Profitability Analysis?

  • A. Cost element
  • B. Value in Controlling Area Currency
  • C. Version
  • D. Record type

Answer: A

Explanation:
Detailed Explanation:The cost element is a versatile field used in both costing-based and account-based Profitability Analysis, providing detailed insights into cost flows across different dimensions in SAP S
/4HANA.


NEW QUESTION # 31
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.

  • A. Network
  • B. General ledger account
  • C. Asset
  • D. Sales order item
  • E. WBS element

Answer: A,D,E


NEW QUESTION # 32
You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual costs = 1000
What data does the system calculate during results analysis?

  • A. Revenue = 1200; Cost of sales = 1000; Reserve = 200
  • B. Revenue = 1200; Cost of sales = 1000; WIP = 200
  • C. Revenue = 1200; Cost of sales = 800; WIP = 200
  • D. Revenue = 1200; Cost of sales = 800; Reserve = 200

Answer: C


NEW QUESTION # 33
What are some of the objectives of Profitability Analysis?
Note: There are 2 correct answers to this question.

  • A. Allow the company to determine if the sales force achieved their contribution margin goals.
  • B. Allow the company to determine standard costs and revenues according to the period accounting method.
  • C. Provide the company with a detailed view of its financial statements by areas of responsibilities.
  • D. Provide the company with information on the performance of its market segments.

Answer: A,D

Explanation:
Detailed Explanation: Profitability Analysis (CO-PA) aims to assess the performance of market segments (option A) and monitor whether sales teams meet their margin targets (option C). This provides valuable insights into product and market profitability for strategic decision-making.


NEW QUESTION # 34
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.

  • A. Sales deductions
  • B. Order quantity
  • C. Revenues
  • D. Payment Discount

Answer: A,C


NEW QUESTION # 35
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.

  • A. You can define tolerance limits for plan overspend.
  • B. Availability control can check against plan values.
  • C. You can plan multiple versions.
  • D. You can enter costs and revenues.

Answer: C,D


NEW QUESTION # 36
You are creating a new activity type and want to maintain plan prices for a cost center. Which attributes must you configure in the activity type master record?
Note: There are 3 correct answers to this question.

  • A. Activity type category
  • B. Output quantity
  • C. Price indicator
  • D. CO version
  • E. Valid cost center categories

Answer: A,D,E

Explanation:
Detailed Explanation: For maintaining plan prices of a cost center, the activity type master record should include the CO version (option B), valid cost center categories (option C), and the activity type category (option D). These attributes ensure accurate cost allocation and pricing within SAP S/4HANA.


NEW QUESTION # 37
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.

  • A. CDS views support authorization.
  • B. CDS views duplicate data for reporting efficiencies.
  • C. CDS views have no latency.
  • D. CDS views have ready-to-use content.
  • E. CDS views are considered system modifications.

Answer: A,C,D


NEW QUESTION # 38
Which statement best describes the Query Browser for reporting?

  • A. It is a design studio app that comes as standard SAP Fiori content.
  • B. It is the frontend used to define reports in Analysis for Office.
  • C. It is available as an additional license product in SAP S/4HANA.
  • D. It is a desktop browser that integrates with SAP S/4HANA.

Answer: D


NEW QUESTION # 39
You post a billing document for a sales order with sales order controlling.
What data flows to Profit Center Accounting?
Note: There are 2 correct answers to this question.

  • A. Sales deductions
  • B. Order quantity
  • C. Revenues
  • D. Payment discount

Answer: A,C

Explanation:
Detailed Explanation:In SAP S/4HANA, revenues and sales deductions are transferred to Profit Center Accounting during billing document posting. This allows companies to assess profitability by profit center accurately.


NEW QUESTION # 40
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled?
Note: There are 2 correct answers to this question.

  • A. The type of the general ledger account must be primary cost/revenue or secondary cost.
  • B. Account-based Profitability Analysis must be active.
  • C. The type of the addressed ledger must be an extension ledger.
  • D. Costing-based Profitability Analysis must be active.

Answer: A,B

Explanation:
Detailed Explanation: For deriving profitability segments in the Universal Journal, account-based Profitability Analysis must be activated (option A), and the G/L account should be either primarycost/revenue or secondary cost type (option D). This configuration enables detailed profitability tracking in SAP S/4HANA.


NEW QUESTION # 41
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.

  • A. It is used when you perform repetitive manufacturing.
  • B. It is used when controlling by individual production lots or discrete quantities is needed.
  • C. It is used when full cost traceability is needed.
  • D. It is recommended for products with a long production time.

Answer: B,C


NEW QUESTION # 42
Which receiver must be allowed in the settlement profile of product cost collector?

  • A. Cost center
  • B. Material
  • C. Order
  • D. G/L Account

Answer: B


NEW QUESTION # 43
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible?
Note: There are 2 correct answers to this question.

  • A. The purchase order has NOT generated a budget yet.
  • B. The difference of 1000 is within the tolerance limits defined in the configuration.
  • C. The cost element is exempted from budget availability control.
  • D. The purchase order was entered in a different year than the budget.

Answer: B,C


NEW QUESTION # 44
What are characteristics of SAP S/4HANA embedded analytics?
Note: There are 2 correct answers to this question.

  • A. It uses data summarized in SAP BW/4HANA.
  • B. It is part of the core SAP S/4HANA license and uses the same technical stack and user interface.
  • C. It is hosted on the SAP Cloud Platform and integrates seamlessly with SAP S/4HANA on the Fiori Launchpad.
  • D. It uses core data services (CDS) views to create virtual data models (VDMs) for reporting.

Answer: B,D

Explanation:
Detailed Explanation: SAP S/4HANA embedded analytics leverages core data services (CDS) views for real- time reporting (option B) and is part of the standard S/4HANA license, using the same stack andinterface (option C). This integration allows businesses to perform analytics directly within the S/4HANA environment.


NEW QUESTION # 45
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.

  • A. It is used to analyze work in process (WIP) based on actual costs.
  • B. It is used when the focus of controlling is on a stable and continuous production process.
  • C. It is used when periodic costs outweigh daily postings.
  • D. It is used in conjunction with a product cost collector.

Answer: B,D


NEW QUESTION # 46
From which tables does SAP S/4HANA select line items in costing-based Profitability Analysis reports?
Note: There are 2 correct answers to this question.

  • A. CE2XXXX
  • B. CE4XXXX_ACCT
  • C. CE1XXXX
  • D. ACDOCA

Answer: A,C

Explanation:
Detailed Explanation:In costing-based Profitability Analysis, line item tables CE2XXXX and CE1XXXX store relevant profitability data in SAP S/4HANA. These tables are used for reporting detailed cost and revenue allocations.


NEW QUESTION # 47
......

Tested Material Used To C_TS4CO_2023 Test Engine: https://simplilearn.actual4labs.com/SAP/C_TS4CO_2023-actual-exam-dumps.html

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 )
From Monday to Saturday

Support: Contact now