[Jan-2022] SAP E_S4HCON2020 Exam Practice Test Questions - Actual4Labs [Q29-Q53]

Share

[Jan-2022] SAP E_S4HCON2020 Exam Practice Test Questions - Actual4Labs

Updated Certification Exam E_S4HCON2020 Dumps - Practice Test Questions


SAP E_S4HCON2020 Exam Description:

The "SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade" certification exam validates that the candidate possesses the required level of knowledge to perform a technical SAP S/4HANA conversion and an SAP system upgrade. This certification proves that the candidate has an overall understanding and the in‐depth technical skills required. Armed with an understanding of SAP system administration, the candidate can implement this knowledge practically in SAP projects. The enablement for this exam is being provided by the course "ADM328 - SAP S/4HANA Conversion and SAP System Upgrade". It is highly recommended that you have passed the exam C_TADM55_74 or C_TADM55_75 or C_TADM55A_75 prior to taking this exam.

 

NEW QUESTION 29
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages that will be bound to the upgrade
  • B. The SAP Support Packages found in the download directory
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Answer: B

 

NEW QUESTION 30
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of SPAU modification adjustment
  • B. Creation of the table structures in the new SAP HANA database
  • C. Execution of XPRAs and AIMs
  • D. Execution of SPDD modification adjustment
  • E. Execution of eCATTs for business validation tests

Answer: A,C,E

 

NEW QUESTION 31
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Configure it within transaction ATC
  • B. Download it from SAP Support Portal
  • C. Apply the corresponding SAP note via SAP Note Assistant
  • D. Generate it by analyzing the specific custom code via RFC

Answer: B

 

NEW QUESTION 32
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B

 

NEW QUESTION 33
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.

  • A. Network capacity between exporting and importing R31oad processes must be considered.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. SAP HANA Landscape Reorganization requires a manual step to edit a file.

Answer: B,D

 

NEW QUESTION 34
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases DIFF*
  • B. Phases EU_IMPORT*
  • C. Phase DOWNCONF_DTTRANS
  • D. Phase RUN_RSDBSCPY
  • E. Phase RUN_RSPTBFIL _ISUTABU

Answer: A,B,C

 

NEW QUESTION 35
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Reuse a profile for the shadow instance from a previous run.
  • B. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • C. Choose the instance number of the shadow instance.
  • D. Keep archiving on during the whole procedure.

Answer: A,C

 

NEW QUESTION 36
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. SAP S/4HANA conversion to SAP S/4HANA 1709
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. Updating to SAP ECC 6.07 using DMO

Answer: B,C

 

NEW QUESTION 37
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Delete client 066 (Early Watch Client)
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Uninstall industry extensions not supported by SAP S/4HANA
  • D. Install add-on SAP Gateway 7.50

Answer: A,B

 

NEW QUESTION 38
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the dump size of the database export on disk
  • B. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • C. Check the "Charts Control Center" in the SUM UI
  • D. Check the log files written under "SUM\abap\log"

Answer: C

 

NEW QUESTION 39
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. A
  • C. Target DB size will increase temporarily

Answer: A,C

 

NEW QUESTION 40
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Load procedure
  • C. SUM with DMO
  • D. SWPM using the Backup / Restore procedure

Answer: B

 

NEW QUESTION 41
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • C. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

Answer: C

 

NEW QUESTION 42
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
Response:

  • A. Post-downtime
  • B. During downtime
  • C. During uptime
  • D. During SPDD

Answer: A,C

 

NEW QUESTION 43
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can record the modification adjustment during migration and use the transports in the next runs.
  • B. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • C. You can verify that the content of the download directory matches the stack.XML file.
  • D. You can find the optimal number of parallel R3load processes by monitoring host performance.

Answer: B,D

 

NEW QUESTION 44
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In SUM Parameters
  • B. In SUM Phaselist
  • C. In Process Control Center
  • D. In DMO Migration Preparation

Answer: A,C

 

NEW QUESTION 45
ICNV initialization does 3

  • A. Creation of flag
  • B. AA
  • C. Creation of views
  • D. Build index on flag column

Answer: A,C,D

 

NEW QUESTION 46
During a SUM run you vivant to check if the phase SHADOW_IMPORT_INC is still running properly.
Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R3load processes on the host of the primary application server
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for running R3trans processes on the host of the primary application server
  • D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: C,D

 

NEW QUESTION 47
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • B. The upgrade of the PRD must be finished before you start new development in the DEV.
  • C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • D. The transport between Unicode and non-Unicode systems is forbidden.

Answer: C

 

NEW QUESTION 48
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

  • A. SUM continues with the next phase and your modifications are lost
  • B. SUM continues with the next phase and your modifications are kept as In the start release
  • C. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
  • D. Before continuing with the next phase SUM asks for a modification adjustment transport

Answer: B

 

NEW QUESTION 49
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Shadow repository creation (EU_IMPORT*)

Answer: B

 

NEW QUESTION 50
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Perform the migration of data into the new data structure
  • C. Run the database migration to the SAP HANA database
  • D. Apply the recommendations of the simplification list

Answer: A,D

 

NEW QUESTION 51
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

Answer: A,B,E

 

NEW QUESTION 52

  • A. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • B. The source system is non-Unicode and the target database is a scale-out system.
    What do you need to consider?
    There are 2 correct answers to this question.
    Response:
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. Network capacity between exporting and importing R3load processes must be considered.
  • E. SAP HANA Landscape Reorganization requires a manual step to edit a file.

Answer: A,E

 

NEW QUESTION 53
......


SAP E_S4HCON2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Modification Adjustment
  • SUM Execution Part
  • SUM Prepare Part
Topic 2
  • Describe the factors influencing downtime and techniques to reduce downtime
  • SAP S
  • 4HANA Conversion Prepare Phase
Topic 3
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion and SAP system upgrade
Topic 4
  • Monitor and troubleshoot the SUM procedure
  • SUM Monitoring and Troubleshooting
  • Perform the SUM prepare part
Topic 5
  • Perform the modification adjustment with SPDD and SPAU
  • Describe and perform the actions necessary during the SAP S
  • 4HANA conversion prepare phase
Topic 6
  • Handling of an SAP System Landscape
  • Perform the SUM execution part, including DMO


E_S4HCON2020 Exam Certification Details:

Languages:English
Duration:90 mins
Exam:40 questions
Level:Specialist
Cut Score:68%

 

Updated Verified E_S4HCON2020 dumps Q&As - Pass Guarantee or Full Refund: https://simplilearn.actual4labs.com/SAP/E_S4HCON2020-actual-exam-dumps.html

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 )
From Monday to Saturday

Support: Contact now